Change the number of observing nights (in red) for an approximate scaling.
The estimate is reasonable for 3 < nights < 15.
Costs are subject to change.
Final costs will depend on instrument and cryogen delivery schedules.
Assumes a Sharc II cycle every night.
The heterodyne instruments include 5 l /day of LN2 for tuning and calibration.
The sidecab receivers are combined.
For the sidecab and 850
GHz receivers, 60 l LHe dewars are used.
For the other instruments, 100 l LHe dewars are used.
LHe dewar quantization is only approximate.
LHe boiloff from the delivery dewars is ignored.
For the LHe dewars, rental days = observing nights + 2.
Staggered deliveries of LHe are ignored.