uip> observe obj_name
uip> planet name
uip> @ scriptname [parameters]
~bolocam/macros/
.Check the cryostat temperatures at least once an hour. If 40 K rad (right column, fifth row) starts warming significantly, it probably means that the compressor has shut off. In the event this disaster strikes, first ensure that the chiller is still on (third floor - big blue box). If it's not, toggle the switch to the start position. Once the chiller is back online, restart the compressor (second floor, just outside where burnside and lyre sit).
Monitor the weather conditions, specifically the JCMT wind speed and relative humidity, at the EAO weather page, and – if you are at the summit – by periodically going outside.
Approximately 5 minutes after starting each macro, the MUSIC DAQ will display the maximum and average carrier power for each of the readout board on the matlab command window. Check the maximum power is close to -30 dB (within 1 dB) on all of the boards. If they are much lower or are reading 0.00 dB, then the boards are not receiving data and something is wrong. The average power should be between -34 and -36 dB, and will vary from board to board.